{"id":2543,"date":"2024-02-13T07:46:24","date_gmt":"2024-02-13T06:46:24","guid":{"rendered":"https:\/\/puertosecodeantequera.fr\/?p=2543"},"modified":"2024-09-03T14:58:56","modified_gmt":"2024-09-03T12:58:56","slug":"idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain","status":"publish","type":"post","link":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/","title":{"rendered":"IDEC GROUP IBERICA has delivered the 1st phase\u00a0of\u00a0its\u00a0XXL positive energy logistics &amp; indutrial park\u00a0in Antequera, south of Spain"},"content":{"rendered":"\n<p><strong>IDEC GROUP IBERICA, a subsidiary of GROUPE IDEC INTERNATIONAL &#8211; develops Europe&#8217;s 1st positive-energy XXL Logistics &amp; Industrial park in Antequera, southern Spain : PUERTO SECO DE ANTEQUERA.\u00a0The first phase of this ambitious project was completed at the end of December 2023, covering a net\u00a0surface area of 37 hectares.\u00a0A first program is already under development, o\ufb00ering for sale or lease a 42,000 m\u00b2 logistics platform\u00a0that can be divided into two equal areas for multiple users.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/puertosecodeantequera.com\/wp-content\/uploads\/2024\/02\/2024.02.01_GRIDINTER_ANTEQUERA_global_aerienne_avec_fsb_phase01-1-1024x683.jpg\" alt=\"\" class=\"wp-image-2532\"\/><\/figure>\n\n\n\n<p><strong>A STRATEGIC LOCATION<\/strong> <\/p>\n\n\n\n<p>Situated in the south of Spain, PUERTO SECO DE ANTEQUERA emerges as the dry port of Andalusia, strategically positioned near Algeciras, Malaga, and Cadiz. This ambitious project serves as an ideal gateway to Southern Europe, boasting top-ranking maritime, airport, rail, and road connections, making it a perfect location for industrial and logistics activities. The park stretches over more than<br>300 hectares, with a 2nd phase already in progress.<\/p>\n\n\n\n<p><strong>37 HECTARES OF LANDS ALREADY FOR AVAILABLE FOR REAL ESTATE DEVELOPMENT<\/strong><\/p>\n\n\n\n<p>After months of collaboration between local authorities, partners, and GROUP IDEC IBERICA teams, the first phase 37-hectare development is now complete. Key infrastructure includes multiple access points, an interchange designed to accommodate future traffic, engineering structures crossing waterways and railways, a rail terminal connected to the national grid, an electrical substation, wastewater treatment plant, recycling center, sewerage, water supply networks, and various plots for public and private services.<\/p>\n\n\n\n<p><strong>A FIRST LOGISTICS PROJECT ALREADY UNDERWAY<\/strong><\/p>\n\n\n\n<p>The completion of this first phase of development, representing 37 hectares of the global net 160 hectares planned, paves the way to the first program in the PUERTO SECO DE ANTEQUERA park. IDEC GROUP IBERICA\u2019s 1st&nbsp;project, the DRY LOGISTIC 40 is a 42,000 m\u00b2 logistics platform that can be divided into two 21,000 m\u00b2 independent areas. Boasting the highest environmental, quality and safety standards, this program, aiming for BREAAM Level Excellent certification, will feature a floor load of 5 tons\/m\u00b2, a clear height of 12 meters, three levels of tertiary spaces, a concrete structure, 44 docks, a reinforced roadway and a fire system to NFPA standards, as well as several lots for inter-service centers to complete the program.<\/p>\n\n\n\n<p><strong>LOW-CARBON ENERGY APPROACH<\/strong><\/p>\n\n\n\n<p>IDEC GROUP IBERICA teams and its partners have designed PUERTO SECO DE ANTEQUERA as a showcase for energy efficiency. By implementing a diverse and complementary energy mix from local suppliers, the logistics, industrial and utlilities zone aims to encourage the local production and sharing of energy among users. The surplus energy will be used to produce renewable hydrogen.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>IDEC GROUP IBERICA, a subsidiary of GROUPE IDEC INTERNATIONAL &#8211; develops Europe&#8217;s 1st positive-energy XXL Logistics &amp; Industrial park in Antequera, southern Spain : PUERTO SECO DE ANTEQUERA.\u00a0The first phase&#8230;<\/p>\n","protected":false},"author":1,"featured_media":2537,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[46],"class_list":{"0":"post-2543","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-planning","8":"tag-spain"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>IDEC GROUP IBERICA has delivered the 1st phase\u00a0of\u00a0its\u00a0XXL positive energy logistics &amp; indutrial park\u00a0in Antequera, south of Spain - GROUPE IDEC INTERNATIONAL<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"IDEC GROUP IBERICA has delivered the 1st phase\u00a0of\u00a0its\u00a0XXL positive energy logistics &amp; indutrial park\u00a0in Antequera, south of Spain - GROUPE IDEC INTERNATIONAL\" \/>\n<meta property=\"og:description\" content=\"IDEC GROUP IBERICA, a subsidiary of GROUPE IDEC INTERNATIONAL &#8211; develops Europe&#8217;s 1st positive-energy XXL Logistics &amp; Industrial park in Antequera, southern Spain : PUERTO SECO DE ANTEQUERA.\u00a0The first phase...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/\" \/>\n<meta property=\"og:site_name\" content=\"GROUPE IDEC INTERNATIONAL\" \/>\n<meta property=\"article:published_time\" content=\"2024-02-13T06:46:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-03T12:58:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/02\/m30675_Dry-40_CP-Amenagement-scaled-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"991\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"J-Michel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"J-Michel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/\"},\"author\":{\"name\":\"J-Michel\",\"@id\":\"https:\/\/groupeidec-international.com\/en\/#\/schema\/person\/e9849822abbb269a7c4fc8673199c49d\"},\"headline\":\"IDEC GROUP IBERICA has delivered the 1st phase\u00a0of\u00a0its\u00a0XXL positive energy logistics &amp; indutrial park\u00a0in Antequera, south of Spain\",\"datePublished\":\"2024-02-13T06:46:24+00:00\",\"dateModified\":\"2024-09-03T12:58:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/\"},\"wordCount\":428,\"publisher\":{\"@id\":\"https:\/\/groupeidec-international.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/02\/m30675_Dry-40_CP-Amenagement-scaled-1.jpg\",\"keywords\":[\"Spain\"],\"articleSection\":[\"Planning\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/\",\"url\":\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/\",\"name\":\"IDEC GROUP IBERICA has delivered the 1st phase\u00a0of\u00a0its\u00a0XXL positive energy logistics &amp; indutrial park\u00a0in Antequera, south of Spain - GROUPE IDEC INTERNATIONAL\",\"isPartOf\":{\"@id\":\"https:\/\/groupeidec-international.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/02\/m30675_Dry-40_CP-Amenagement-scaled-1.jpg\",\"datePublished\":\"2024-02-13T06:46:24+00:00\",\"dateModified\":\"2024-09-03T12:58:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#primaryimage\",\"url\":\"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/02\/m30675_Dry-40_CP-Amenagement-scaled-1.jpg\",\"contentUrl\":\"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/02\/m30675_Dry-40_CP-Amenagement-scaled-1.jpg\",\"width\":2560,\"height\":991},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Homepage\",\"item\":\"https:\/\/groupeidec-international.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Planning\",\"item\":\"https:\/\/groupeidec-international.com\/en\/category\/planning\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"IDEC GROUP IBERICA has delivered the 1st phase\u00a0of\u00a0its\u00a0XXL positive energy logistics &amp; indutrial park\u00a0in Antequera, south of Spain\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/groupeidec-international.com\/en\/#website\",\"url\":\"https:\/\/groupeidec-international.com\/en\/\",\"name\":\"GROUPE IDEC INTERNATIONAL\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/groupeidec-international.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/groupeidec-international.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/groupeidec-international.com\/en\/#organization\",\"name\":\"GROUPE IDEC INTERNATIONAL\",\"url\":\"https:\/\/groupeidec-international.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/groupeidec-international.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/04\/logo_groupe-idec-international_black_175x75.png\",\"contentUrl\":\"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/04\/logo_groupe-idec-international_black_175x75.png\",\"width\":175,\"height\":75,\"caption\":\"GROUPE IDEC INTERNATIONAL\"},\"image\":{\"@id\":\"https:\/\/groupeidec-international.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/idec-group-iberica\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/groupeidec-international.com\/en\/#\/schema\/person\/e9849822abbb269a7c4fc8673199c49d\",\"name\":\"J-Michel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g\",\"caption\":\"J-Michel\"},\"sameAs\":[\"https:\/\/groupeidec-international.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"IDEC GROUP IBERICA has delivered the 1st phase\u00a0of\u00a0its\u00a0XXL positive energy logistics &amp; indutrial park\u00a0in Antequera, south of Spain - GROUPE IDEC INTERNATIONAL","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/","og_locale":"en_US","og_type":"article","og_title":"IDEC GROUP IBERICA has delivered the 1st phase\u00a0of\u00a0its\u00a0XXL positive energy logistics &amp; indutrial park\u00a0in Antequera, south of Spain - GROUPE IDEC INTERNATIONAL","og_description":"IDEC GROUP IBERICA, a subsidiary of GROUPE IDEC INTERNATIONAL &#8211; develops Europe&#8217;s 1st positive-energy XXL Logistics &amp; Industrial park in Antequera, southern Spain : PUERTO SECO DE ANTEQUERA.\u00a0The first phase...","og_url":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/","og_site_name":"GROUPE IDEC INTERNATIONAL","article_published_time":"2024-02-13T06:46:24+00:00","article_modified_time":"2024-09-03T12:58:56+00:00","og_image":[{"width":2560,"height":991,"url":"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/02\/m30675_Dry-40_CP-Amenagement-scaled-1.jpg","type":"image\/jpeg"}],"author":"J-Michel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"J-Michel","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#article","isPartOf":{"@id":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/"},"author":{"name":"J-Michel","@id":"https:\/\/groupeidec-international.com\/en\/#\/schema\/person\/e9849822abbb269a7c4fc8673199c49d"},"headline":"IDEC GROUP IBERICA has delivered the 1st phase\u00a0of\u00a0its\u00a0XXL positive energy logistics &amp; indutrial park\u00a0in Antequera, south of Spain","datePublished":"2024-02-13T06:46:24+00:00","dateModified":"2024-09-03T12:58:56+00:00","mainEntityOfPage":{"@id":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/"},"wordCount":428,"publisher":{"@id":"https:\/\/groupeidec-international.com\/en\/#organization"},"image":{"@id":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#primaryimage"},"thumbnailUrl":"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/02\/m30675_Dry-40_CP-Amenagement-scaled-1.jpg","keywords":["Spain"],"articleSection":["Planning"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/","url":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/","name":"IDEC GROUP IBERICA has delivered the 1st phase\u00a0of\u00a0its\u00a0XXL positive energy logistics &amp; indutrial park\u00a0in Antequera, south of Spain - GROUPE IDEC INTERNATIONAL","isPartOf":{"@id":"https:\/\/groupeidec-international.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#primaryimage"},"image":{"@id":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#primaryimage"},"thumbnailUrl":"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/02\/m30675_Dry-40_CP-Amenagement-scaled-1.jpg","datePublished":"2024-02-13T06:46:24+00:00","dateModified":"2024-09-03T12:58:56+00:00","breadcrumb":{"@id":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#primaryimage","url":"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/02\/m30675_Dry-40_CP-Amenagement-scaled-1.jpg","contentUrl":"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/02\/m30675_Dry-40_CP-Amenagement-scaled-1.jpg","width":2560,"height":991},{"@type":"BreadcrumbList","@id":"https:\/\/groupeidec-international.com\/en\/idec-group-iberica-has-delivered-the-1st-phase-of-its-xxl-positive-energy-logistics-indutrial-park-in-antequera-south-of-spain\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Homepage","item":"https:\/\/groupeidec-international.com\/en\/"},{"@type":"ListItem","position":2,"name":"Planning","item":"https:\/\/groupeidec-international.com\/en\/category\/planning\/"},{"@type":"ListItem","position":3,"name":"IDEC GROUP IBERICA has delivered the 1st phase\u00a0of\u00a0its\u00a0XXL positive energy logistics &amp; indutrial park\u00a0in Antequera, south of Spain"}]},{"@type":"WebSite","@id":"https:\/\/groupeidec-international.com\/en\/#website","url":"https:\/\/groupeidec-international.com\/en\/","name":"GROUPE IDEC INTERNATIONAL","description":"","publisher":{"@id":"https:\/\/groupeidec-international.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/groupeidec-international.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/groupeidec-international.com\/en\/#organization","name":"GROUPE IDEC INTERNATIONAL","url":"https:\/\/groupeidec-international.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/groupeidec-international.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/04\/logo_groupe-idec-international_black_175x75.png","contentUrl":"https:\/\/groupeidec-international.com\/wp-content\/uploads\/2024\/04\/logo_groupe-idec-international_black_175x75.png","width":175,"height":75,"caption":"GROUPE IDEC INTERNATIONAL"},"image":{"@id":"https:\/\/groupeidec-international.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/idec-group-iberica\/"]},{"@type":"Person","@id":"https:\/\/groupeidec-international.com\/en\/#\/schema\/person\/e9849822abbb269a7c4fc8673199c49d","name":"J-Michel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8112561cfb89241ffe7ea765b7ec7b5ac1b9e4657aa6f87aec6721658152e18b?s=96&d=mm&r=g","caption":"J-Michel"},"sameAs":["https:\/\/groupeidec-international.com"]}]}},"_links":{"self":[{"href":"https:\/\/groupeidec-international.com\/en\/wp-json\/wp\/v2\/posts\/2543","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeidec-international.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeidec-international.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/groupeidec-international.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeidec-international.com\/en\/wp-json\/wp\/v2\/comments?post=2543"}],"version-history":[{"count":4,"href":"https:\/\/groupeidec-international.com\/en\/wp-json\/wp\/v2\/posts\/2543\/revisions"}],"predecessor-version":[{"id":7761,"href":"https:\/\/groupeidec-international.com\/en\/wp-json\/wp\/v2\/posts\/2543\/revisions\/7761"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeidec-international.com\/en\/wp-json\/wp\/v2\/media\/2537"}],"wp:attachment":[{"href":"https:\/\/groupeidec-international.com\/en\/wp-json\/wp\/v2\/media?parent=2543"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeidec-international.com\/en\/wp-json\/wp\/v2\/categories?post=2543"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeidec-international.com\/en\/wp-json\/wp\/v2\/tags?post=2543"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}